The University of Northumbria at Newcastle has published this notice through Delta eSourcing
Notice Summary |
---|
Title: | T22/0038 - COACH LANE: Coach Lane East - Heat pumps PCSA/D&B |
Notice type: | Additional Information / Corrigendum Notice |
Authority: | The University of Northumbria at Newcastle |
Nature of contract: | Works |
Procedure: | Open |
Short Description: | Coach Lane East - Heat pumps PCSA/D&B for the Coach Lane East Decarbonisation project. |
Published: | 03/10/2024 11:26 |
View Full Notice
Section I: Contracting authority/entity (as stated in the original notice)
I.1) Name and addresses
Northumbria University
Pandon Building, Camden Street, Newcastle upon Tyne, UK-Newcastle upon Tyne: Demolition, site preparati, NE1 8ST, United Kingdom
Tel. +44 7548775792, Email: terri.hudson@northumbria.ac.uk
Contact: Terri Hudson
Main Address: www.northumbria.ac.uk
NUTS Code: UKC21
Section II: Object (as stated in the original notice)
II.1) Scope of the procurement
II.1.1) Title: T22/0038 - COACH LANE: Coach Lane East - Heat pumps PCSA/D&B Reference number: T22/0038
II.1.2) Main CPV code:
45214400 - Construction work for university buildings.
II.1.3) Type of contract: WORKS
II.1.4) Short Description: Coach Lane East - Heat pumps PCSA/D&B for the Coach Lane East Decarbonisation project.
Section VI: Complementary information
V1.5) Date of dispatch of this notice: 03/10/2024
VI.6) Original notice reference:
Notice Reference: 2024 - 664198
Notice number in OJ S: 2022/S 000 - 026428
Date of dispatch of the original notice: 29/04/2024
Section VII: Changes
VII.1) Information to be changed or added
VII.1.1) Reason for change: Modification of original information submitted by the contracting authority
VII.1.2) Text to be corrected in original notice No: 1
Section Number: II.1.7
Lot No: Not provided
Place of text to be modified: Total value of the procurement (excluding VAT)
Instead of: £3,508,935.65
Read: £3,538,935.65
VII.2) Other additional information: The extension in value and time is due to variation to works and repairs which are detailed below:
• Roof repairs needed while the scaffolding was up - Equans must arrange the work as only their contractors are insured for their scaffold.
• One extra week of scaffold hire to avoid removal during exam period.
• Filtration system as an addition to the original scope to help with the hygiene of the water within the system moving forward.
• Sport centre manager requires covers/panels attaching to
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=893266625